Abstract
Meeting the power demand from the transmission system operator is an important objective for power dispatch, which introduces a power supply-demand equality constraint coupling all the wind turbines among the wind farm into the optimization problem. For a large-scale wind farm, processing the global equality constraint in a centralized or distributed framework is time-consuming and computationally complex. Here we considered the fast and localized execution issue of the power optimal dispatch problems. A completely decentralized dynamic system was designed to optimize power flow while satisfying the electricity supply constraints. A voltage optimization problem with the global power constraints was decoupled into local wind turbine controllers based on the node-dependence nature, which is an inherent characteristic of wind farms and was fitted to the power sensitivity matrix in this paper. The local optimization problem was solved iteratively using the gradient projection method, and the system converged linearly to the equilibrium point. The simulations for the case studies performed in Simulink demonstrate that the proposed method achieves a near-global optimal performance using only local measurements.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.