Abstract

AbstractRecently, a new plating system was proposed based on a strain localization mechanism for addressing the critical debonding problem in externally bonded reinforcing systems for reinforced concrete (RC) structures. The system delays or inhibits debonding by localizing the large strain of the externally bonded reinforcement in certain areas and leaving other places in a smaller strain condition to ensure that global debonding does not occur. This debonding avoidance strategy is in line with the concept of controlling a flood by channeling water away rather than blocking it. Two techniques have been used to achieve strain localization: (1) a nanotechnology called surface mechanical attrition treatment and (2) variation in the cross-sectional area of bonded reinforcement. To better understand this newly developed system, this paper presents a numerical study of RC beams strengthened with such plating systems. This study leads to a better understanding of the mechanism for inhibiting debonding and the d...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.