Abstract

The Muke River is prone to flooding. flooding is caused by conversion in land use due to the migrating plantation system. In the Muke river, it is necessary to analyze the discharge estimation to determine the potential of water in the Muke river. In this study, the authors performed peak discharge calculation using measured calculation model and calculate. Measured calculations using discharge’s curve and calculated by using hydrographic method of synthetic unit namely Nakayasu. The results of the analysis for the calculation of discharge on the Muke river using the discharge curve obtained that the peak discharge occurred in 2012 with Qmax = 99.41 m3/s and the smallest discharge occurred in 2010 with Qmin = 13.19 m3/s, the results of the analysis for the calculation of discharge on the Muke river using the Nakayasu method obtained peak discharge occurred in 2010 with Qmax= 184.74 m3/s and the smallest discharge occurred in 2014 with Qmin = 94.33 m3/s.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.