Abstract

The experience gained from the operating results of a 30 t DC furnace and a comparison of this unit with an existing AC arc furnace of the same size that was operated at the Tampa plant gave rise to Florida Steel Corporationfs decision of installing a new 60 t DC arc furnace.In mid 1989, Deutsche Voest-Alpine Industrieanlagenbau GmbH and Florida Steel Corp., Tampa USA, signed a contract for the development of a new DC arc furnace as well as its implementation at the works of Florida Steel Corp. at Tampa.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.