Abstract

This paper presents a day-ahead coordinated scheduling method of hydro and wind power generation systems (HWPGSs) with consideration of uncertainties. In this method, we first formulate the coordinated scheduling model with two-part price and power flow constraints, which manifests the fixed and variable economic benefits as well as the secure operation of HWPGS, respectively. Then, the interval analysis is used to study the effect of uncertain wind power, water inflow, and electricity load on the coordinated scheduling model. Finally, we use a real test system in a western area of China to conduct simulation studies, which verify the effectiveness of the interval analysis and the effect of price mechanism on the day-ahead coordinated scheduling of HWPGS.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.