Abstract

This study describes the release of electricity consumption data of some manufacturing factories located in South Korea that participate in the demand response (DR) market. The data (in kilowatt) comprise individual factories’ total power usage details that were acquired using advanced metering infrastructures. They further contain details on the manufacture types, DR participation dates, mandatory reduction capacities, and response capacities of the factories. For data acquisition, 10 manufacturing companies are representatively selected according to the process regularity and company size standard of this study. Entire datasets are newly collected and available at one-minute intervals for seven months from 1 March to 30 September 2019. These datasets can be used in a variety of ways to contribute to the functioning of power systems and markets, including the conduction of industrial load characteristic analysis for load flexibility, estimation of demand-side considerations for virtual power plant design, and determination of energy markets and incentives to achieve carbon neutrality targets at the national level.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call