Abstract

AbstractThis paper presents a case study from a manufacturer of aluminum products characterized by a complex and flexible production system with a broad product variety. We examine the application of the data mining process for generating planning rules. The resulting planning rules can be implemented in a manufacturing execution system to support the decision process in decentralized manufacturing control. The aim is to discover patterns and drivers for high manufacturing lead time from ERP data in order to define planning rules with the objective to reduce lead time.KeywordsData miningManufacturing controlPlanning rules

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.