Abstract
The transmission-constrained unit commitment (TC-UC) problem is one of the most relevant problems solved by independent system operators for the daily operation of power systems. Given its computational complexity, this problem is usually not solved to global optimality for real-size power systems. In this paper, we propose a data-driven method that leverages historical information to screen out network constraints in the TC-UC problem. First, past data on demand and renewable generation throughout the network are used to learn the congestion status of transmission lines. Then, we infer the lines that will not become congested for upcoming operating conditions based on such learning and disregard their capacity constraints. This way, we formulate a reduced TC-UC problem that is easier to solve. Numerical results on a medium- and a large-size power system show that the proposed approach outperforms existing ones by significantly reducing the computational time while obtaining solutions that are equal or close to the one obtained with the original TC-UC problem. Furthermore, the purely data-driven method we propose can be seamlessly complemented with a constraint generation procedure to guarantee that the optimal solution to the original TC-UC problem is eventually recovered.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.