Abstract

The number of electric vehicles (EVs) is expected to grow significantly, which calls for effective planning of charging infrastructures. While the planning of the charging infrastructure relies on an accurate charging demands, the behaviours of EVs charging are not always predictable and can be sensitive to many uncertain future environmental factors. Considering such uncertainties, this study aims to robustly and optimally determine the chargers and main switch board (MSB) capacities without violating queuing time constraints and load flow constraints. The non-parametric estimations of charging demands are derived with data-driven charging behaviour analysis considering diverse social factors, including travelling patterns, queuing, and changes of charging facilities. Then, the impacts of the EV integration are modeled by a stochastic load flow program. The samples of the stochastic load flow stipulate the conditional value-at-risk constraints for the planning of chargers and MSBs, which consider the probabilities and scenarios in a box of ambiguity with bounds. Afterwards, by limiting the frequency and severity of constraints violation, the total investment cost is minimized with a distributionally robust optimisation program. Simulation based on a real-world residential community in Singapore is carried out to testify the effectiveness of the proposed method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.