Abstract

In this paper, it has been shown that the data-driven reallocation of workers in a turbine valve assembly island is necessary because the occurrence of unexpected events delays the desired completion time defined in the schedule. The main characteristics of the problem are as follows: 1) the turbine valve is placed on a fixed site, and the workers and the required equipment are moved to the assembly site; 2) the sequence of assembly tasks is fixed, which reduces the number of significant disruptions to the upstream operations; and 3) the processing time of each task is dependent of the skill level and the number of the assigned workers. This paper proposes data-driven reallocation of workers in engineering-to-order assembly islands to meet the specified due dates and use human resources efficiently. The goal is to minimize the labor cost by reallocating the workers in order to meet the due dates when an unexpected event occurs. The problem was modeled as an integer program and optimally solved by means of the LINGO (Linear Interactive and General Optimizer) 11.0 optimizer. The experimental results showed that the solutions obtained were improvements to the solutions implemented by the foreman.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.