Abstract
Inspection and maintenance activities are essential to preserving safety and cost-effectiveness in railways. However, the stochastic nature of railway defect occurrence is usually ignored in literature; instead, defect stochasticity is considered independently of maintenance scheduling. This study presents a new approach to predict rail and geometry defects that relies on easy-to-obtain data and integrates prediction with inspection and maintenance scheduling activities. In the proposed approach, a novel use of risk-averse and hybrid prediction methodology controls the underestimation of defects. Then, a discounted Markov decision process model utilizes these predictions to determine optimal inspection and maintenance scheduling policies. Furthermore, in the presence of capacity constraints, Whittle indices via the multi-armed restless bandit formulation dynamically provide the optimal policies using the updated transition kernels. Results indicate a high accuracy rate in prediction and effective long-term scheduling policies that are adaptable to changing conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transportation Research Part C: Emerging Technologies
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.