Abstract
In view of the problems that there are many well control risk points and the situation is grim of Xinjiang No.1 gas production plant, this paper carries out the gas well integrity evaluation and risk assessment, and establishes the comprehensive fuzzy evaluation model (FCEM) of gas well integrity. This paper analysed the integrity status of gas wells in Xinjiang No.1 gas production plant, establishes the integrity evaluation index system with well barrier components, real-time dynamic index and management organization as the main influence factors, determines the membership function of each index, calculates the weight of each index by using analytic hierarchy process(AHP), and establishes the risk degree calculation model by using fuzzy comprehensive evaluation, Quantitative analysis of gas well integrity. In this paper, a case study of a well in Xinjiang No.1 gas production plant shows that the model can quantitatively calculate the risk of gas well integrity and provide a reference for early warning of gas well integrity failure.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.