Abstract

TG2 is a GE 660 MW steam turbine generator unit at Hartlepool power station in North East of England. The unit consists of an HP turbine, an IP turbine and three LP turbines coupled with an alternator and an exciter. Although the unit was previously operating normally and within the established ISO standards, recent reports indicated excessive loading on the barring gear and instances of the barring gear becoming stuck. EDF Energy's central technical organization conducted a comprehensive analysis of the vibration data, including online, barring, run up, and run down data, to determine the root cause of the overloading. The data analysis revealed that the generator NDE bearing (bearing 12) showed signs of tilting, reducing the clearance between the shaft and the bearing and causing friction. This friction was determined to be the cause of the overloading of the barring gear. The generator operates in a pressurized hydrogen environment and changes in pressure during operation and shutdown had a ratcheting effect on the bearing tilt and clearance reduction. The EDF Energy engineering team responded promptly and professionally, documenting the issue, raising awareness among operations, and implementing a recovery plan.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.