Abstract
<p>The operation of maintenance in the railway industry is high priorities for safety which reflects the train services. The Kelana Jaya Line (KJL) is the leading urban metro train operator among light rail transit (LRT) categories in Malaysia. The main issue in KJL, they are facing huge historical data from the supervisory control and data acquisition (SCADA) logger when organizing the corrective maintenance work schedule. The previous conventional method leads to time constraint which causes redundancy of data reading. Hence, SCADA Dashboard was developed as a tool to structure their work prioritization for weekly planning. It was developed by using Microsoft Power Query and Power Pivot, in the advanced Excel software. The dashboard evaluation was performed based on usability and user experience studies. The evaluation test proves that the dashboard can be used effectively and it’s beneficial to the organizations as well as a contribution towards systematic maintenance.</p>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Advances in Applied Sciences
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.