Abstract

The paper describes the consequences of new design requirements for the Darlington vacuum building on its structural configuration, analytical procedures and reinforcing steel layout. Attention focuses on the ring girder where the juncture of dome and perimeter wall produces a complex post-tensioning layout, and attendant difficulties in design and construction. At the wall base, full fixity imposes large local stresses. Long-term, shrinkage and creep, and temperature effects become significant. A research program and in-house analytical procedure established time-dependent concrete behaviour and corresponding wall-sectional stresses. The outcome is examined in terms of reinforcement, temperature controls, and wall liner requirements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.