Abstract

This paper presents and compares different POD controller options for a hybrid PV+BESS installation, starting from the layout of a real plant in Mexico. The POD controllers are designed using the pole placement method and identification techniques, based on selected recorded signals. The different POD controllers (PV, BESS and PV+BESS) are integrated in the main Power Plant Controller (PPC) and their performance is tested using a representative test system. Case studies show that coordinated action of the PV+BESS can significantly increase the damping support for the system, particularly in scenarios with limited plant capability. Sensitivity analysis is also presented in this work to evaluate the impact of delays of communication channels on the POD performances and the impact of operating with different oscillation frequencies.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.