Abstract

In 5 recent years (2000–2004), the Changjiang (Yangtze) River has discharged past Datong (600 km from the river mouth) an average of ∼250 million tons (mt) of sediment per year, a decrease of more than 40% since the 1950s and 1960s, whereas water discharge at Datong has increased slightly. Water and sediment discharge data from the upper, middle, and lower reaches of the river suggest that the reduction of the Changjiang sediment load has occurred in two phases between 1950 and 2002: following the closure of the Danjiangkou Reservoir on the Hanjiang tributary in 1968 and following the installation of numerous dams and water‐soil conservation works in the Jialingjijang catchment after 1985. As the Three Gorges Dam (TGD) started operating in 2003, the Changjiang entered a third phase of sediment reduction with annual sediment loads at Datong less than 200 mt/yr. Upon completion of the Three Gorges Dam (TGD) in 2009, the sediment load at Datong will decrease to ∼210 mt/yr for the first 20 years, then will recover to ∼230 mt/yr during 2030–2060, and will reach ∼310 mt/yr during 2060–2110. From the sediment budget and sediment erosion data for the Changjiang subaqueous delta, it can be assumed that the delta will be eroded extensively during the first five decades after TGD operation and then will approach a balance during the next five decades as sediment discharging from TGD again increases.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.