Abstract
AbstractThis paper considers the operation of hydro plants, tackles the problem of daily hydro-generation scheduling (DHGS), and obtains the optimal hourly operation of cascade hydropower reservoirs. To meet the practical operational demands of power grid, an improved benefit-maximization model in which the peak shaving demands are taken as constraints is proposed for DHGS, and the joint peak load regulation (JPLR) method is applied to the proposed model. The model can enhance the power-generation efficiency and reduce the water spillage significantly under the condition of peak load regulation. Meanwhile, a hybrid method that combines discrete differential dynamic programming with progressive optimality algorithm is proposed to solve the JPLR problem. The complicated constraints can be handled by the proposed algorithm effectively. Moreover, the hydro-unit-commitment problem is solved by a rapid searching algorithm based on equal incremental principle and empirical methods. With this unit-commitment stra...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Water Resources Planning and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.