Abstract
AbstractThis study addresses cyclic scheduling in robotic flowshops with bounded work‐in‐process (WIP) levels. The objective is to minimize the cycle time or, equivalently, to maximize the throughput, under the condition that the WIP level is bounded from above by a given integer number. We present several strongly polynomial algorithms for the 2‐cyclic robotic flowshop scheduling problems for various WIP levels. © 2010 Wiley Periodicals, Inc. Naval Research Logistics 58: 1–16, 2011
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.