Abstract

This paper addresses cyclic scheduling of a single hoist in large real-life electroplating lines, where a part visits some processing tanks more than once and multiple duplicate tanks are used at some production stages having long processing times. We present a formal analysis of the problem and propose an efficient branch-and-bound algorithm. The developed analytical properties allow us to considerably eliminate dominated or infeasible solutions in the branch-and-bound procedure. Computational results on benchmark and real-life instances show that the algorithm is very efficient in scheduling large electroplating lines.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.