Abstract

Cut-off grade optimisation is necessary for operational decision making in the many different circumstances affecting mine operations. The cut-off grades are supposed to reflect particular circumstances of specific mines in order to achieve the maximum economic return over the life of the mine. The relationship between cut-off grade and NPV provides a means by which cut-off grades are optimised. Using Lane's approach, the economics involved in each stage are identified independently and integrated to provide an optimum cut-off grade. A block model from a hypothetical gold mine is used to illustrate how Whittle 4X applies Lane's approach to generate an optimal cut-off grade policy for the mine. The cut-off grade in this project slightly changes along the mine life. Higher grade ore is mined in the early years (years 2 and 4) while the lower grade ore is mined later.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.