Abstract

A CUSUM control scheme for detecting a change point in a Gaussian process is derived. An upper and a lower bound for the distribution of the run length and for its moments is given. In a Monte Carlo study the average run length (ARL) of this chart is compared with the ARL of two other CUSUM procedures which are based on approximations to the sequential probability ratio, and, moreover, with EWMA schemes for autocorrelated data. Results on the optimal choice of the reference value are presented. Furthermore it is investigated how these charts behave if the model parameters are estimated.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call