Abstract

This paper presents customer based multi-objective capacitor allocations and DG integrations considering total cost, energy loss, SAIFI, SAIDI and AENS in sixty nine bus microgrid type radial distribution system. The multi-objective optimization has been approached here by evolutionary algorithm viz. Fish Electrolocation Optimization (FEO). Non dominated solutions achieved after performing multi-objective optimization using evolutionary technique have been analyzed by TOPSIS method for customer based decision making. Customers such as office/building, commercial and industrial types have been considered here for evaluation purpose. The results achieved after simulation for different customers are promising and encouraging in nature.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.