Abstract

Currently, opencast coal mines of Electric Power Industry of Serbia (EPS) produce about 40 million tonnes of lignite per year within two basins (Kolubara and Kostolac basins) and five opencast mines (Field C, Field D, Field G, Tamnava West Field and Drmno). On that basis, 70% of Serbia's electric power is being produced in Serbia. Since some opencast mines are undertaking closure procedure, it is necessary to open replacement capacities in order to maintain lignite production. This paper shows the current state, development perspectives, opening plans for new opencast mines and planned continuous mining systems which are foreseen to operate in the future time period.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.