Abstract

The challenge of cooling down the huge cold mass up to 1100 tons (dominated by iron) to 4.5K is addressed as one of the most important features for Super-FRS cryogenics at FAIR. For such large cold mass precooling with LN2 is necessary due to the reason that approximately 80% of the cool down load is from 300K to 80K. The capacity of the LN2 precooler at 80K as well as the 4.5K cooling power have been specified in order to reach a reasonable cooldown time of three to four weeks. In the paper we will also discuss the technical issues for Super-FRS magnet testing at CERN in terms of the limitations of the cooldown / warmup rates on magnets, interface definition, and the magnet cryostat protection against over-pressure under worst-case scenarios, i.e., quench and insulation vacuum sudden loss to air, which are the key issues for the cryogenic test facility planning and machine protection at FAIR. Meanwhile the important features of the refrigerator and the cryogenic distribution system for the Super-FRS at FAIR will be discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.