Abstract

The objective of this program was to recommend the most attractive combinations of acid gas removal methane separation systems for the Exxon Catalytic Coal Gasification (CCG) and the Rockwell Hydrogasification process currently undergoing development supported by DOE. The program was comprised of the following tasks. Screening to define the most promising integration scheme for each gasification process; development of a process flowsheet, heat and material balance, P and ID, equipment specification, utility summary, and plot plan for the process combination selected; and preparation of detailed economic and final report. The results of the study are documented in this report. The evaluations were performed using data supplied by the prime coal gasification contractors and the vendors of proprietary acid gas removal processes. This information, combined with Air Products' in-house capabilities in acid gas and cryogenic separation processses, was used to develop process designs and cost estimates for each integrated system. The design based and economic criteria employed in the study are described.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call