Abstract

The Large Hadron Collider (LHC) project at CERN will require about 1800 high-field superconducting magnets, operating below 1.9 K in pressurized helium II. All magnets will be reception-tested before their installation in the 26.7 km circumference ring tunnel. For this purpose, we have installed large-capacity cryogenic facilities, beginning to operate for tests of full-scale prototype magnets produced by European industry. Based around a 6 kW@4.5 K helium refrigerator and a 25 m3 liquid helium storage, the system includes a low-pressure, 6 to 18 g/s helium pumping unit for 1.8 K refrigeration, a set of magnet cooldown and warmup units delivering each up to 120 kW of refrigeration at precisely controlled temperature, and a network of cryogenic lines for transferring liquid nitrogen, liquid helium and cold gaseous helium. All components are controlled by embedded PLCs, connected to a general supervision system for operator interface. We present the system layout and describe the design and performance of the main components.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call