Abstract
This paper introduces the notion of “temporal boundary spanning” and highlights the key role of project management in resolving temporal tensions among partners participating in interorganizational projects (IOPs). The present study, which is based on data from 93 IOPs undertaken within a major change program, relies on in-depth, semi-structured interviews, observations, and detailed analyses of written documents and procedures from those IOPs. Based on the data, we inductively develop a practice-based theory that identifies three main practices (framing, synchronizing, hyping) used to resolve the central temporal tensions observed in the studied IOPs. In that respect, the paper offers novel insights into the role and practice of project management in IOPs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.