Abstract
The authors analysed the cross-correlation of photovoltaic (PV) output fluctuation for the actual PV output time series data in both the Tokyo area and the whole of Japan using the principal component analysis with the random matrix theory. Based on the obtained cross-correlation coefficients, the forecast error for PV output was estimated with/without considering the cross-correlations. Then the operation schedule of thermal plants is calculated to integrate PV output using the proposed unit commitment model with the estimated forecast error. The system-balancing cost of PV system was also estimated with or without demand response. Finally, validity of the concept of ‘local production for local consumption of renewable energy’ and alternative policy implications were discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.