Abstract

PurposeThe success rate of design-build (D-B) implementation in Malaysia’s private construction projects is low compared to the nation’s public projects. Thus, the purpose of this paper is to investigate the critical success factors (CSFs) for D-B implementation in Malaysian public construction projects.Design/methodology/approachTo achieve the research objectives, 111 questionnaire survey responses from construction-related professionals were collected and analysed using multivariate analysis, including t-test, analysis of variance (ANOVA) and factor analysis.FindingsThe results indicate that while the client’s briefing effectiveness remained the top CSF among many nations, the other top CSFs in Malaysia D-B construction projects vastly differed compared to those countries. Moreover, the underlying components for successful D-B projects in Malaysia include the project management team, leader competency and “stakeholder” management.Originality/valueThis is one of the first studies that identify the CSFs for D-B implementation in the Malaysian construction industry. The outcomes provide a valuable reference and resource for academic scholars and construction practitioners to increase D-B implementation in the Malaysian private sector.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.