Abstract

: This research paper explored the critical strategies to be adopted by organizations that are mainly operating based on project based or project oriented organizational structure. The identified strategies are necessary to compensate the prolong issues embedded in project management practice particularly on misalignment issues between organization and its operational objectives and strategies. Generally, the issues are contributed from several factors such as unclear roles and responsibilities, limited autonomy and accountability, lack of a commercial and customer orientation, and weak of professional capacity. All these factors are extending the gap between the organization strategies and project implementation, and consequently put project success at stake. This study was conducted as an attempt to provide solutions to overcome these long rooted problems found in project implementation. The objectives of this study are to identify the importance factors of top management support to influence on project success, to investigate the relationship between top management support and project success, and to determine the critical top management support that influencing project success. This study was conducted by going through five main steps starting with understanding the nature of the research problems, followed with reviewing and compiling relevant literatures, journals and other sources of secondary data, preparing survey questionnaire form, collecting the data by gathering responses from the targeted samples, analysing the data to generalize the samples’ results, before closing with discussion and conclusion. The population of this study are constituted of professional serving in Construction Industry within Johor Bahru area, Malaysia. This study had gathered 100 responses from the targeted respondents through online survey form developed in “Google Form” system. The forms were distributed by forwarding the “link address” to the respondents. The data were analyzed using three different methods which are descriptive mean analysis, correlation analysis and regression analysis for respective research’s objectives. The results of this study discovered that organization should prioritize their strategies on three main areas namely financial system, stakeholder management and macro-economic factor. This study also found that organization should adopt all quality of top management supportive behaviours proportionally to ensure the effect of their actions are impactful to influence on project success at three different areas namely future preparation, project efficiency, and business adaptability and success. Organization should adopt different strategies when attempting to achieve different criteria of project success. This study’s outcomes could provide a useful source of information that may benefit other scholars or companies that are applying project management practice to formulate plan and prioritize line of actions in attempt to improve their organizational performance. This study implies ideas by focusing on optimum numbers of strategies and specific set of actions that are critical to achieve on different kind of project success.

Highlights

  • IntroductionConflict of interest and alignment issues between organizational and project objectives can affect both the project and organizations in terms of money, time, and customer satisfaction [34]

  • This study was initiated based on common problems found in project management practice with the focus centralized on higher management strategies and its impacts on project success

  • This study discovers the impactful actions of top management support to be adopted by any project-based or project-oriented organizations as their strategic implementation to pursue for project success

Read more

Summary

Introduction

Conflict of interest and alignment issues between organizational and project objectives can affect both the project and organizations in terms of money, time, and customer satisfaction [34]. This issue directly affects the project management process including technical, functional or business related events during the project implementation [3]. It is more adverse when handling the project issues in construction industry where all of these issues generally contribute to project deferment and worst to the extent of abandonment [40]. This study discovers the impactful actions of top management support to be adopted by any project-based or project-oriented organizations as their strategic implementation to pursue for project success

Objectives
Methods
Findings
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.