Abstract

The native bee fauna provides an important ecosystem function, but a large proportion of this fauna in Europe is threatened as a result of habitat loss and fragmentation. The solitary bee Andrena hattorfiana is specialised on collecting pollen from the plant-family Dipsacaceae. In northern Europe the major pollen resource is the insect-pollinated herb Knautia arvensis. We quantified the available K. arvensis resource, measured habitat characteristics and performed a flower-visitor survey in 57 well-defined K. arvensis populations in southern Sweden. There was a strong relationship between bee and plant population sizes. In populations with A. hattorfiana present ( N = 26), the female bees utilised on average 39% (12–80%) of the total available pollen resource. The nest architecture and nesting biology of A. hattorfiana is described for the first time. By excavating nests, we found that the provisioning for one average bee nest (containing 6 cells) required ca. 72 inflorescences or 11 plant individuals. The results suggest a certain minimum pollen amount needed to host an A. hattorfiana population. For example, for a population of ten reproducing A. hattorfiana ♀ with the average degree of utilisation, the critical resource was predicted as 156 ± 16 individuals (±SE) of the plant K. arvensis, which corresponds to 780 inflorescences or 36,731,978 pollen grains. These findings suggest that calculations via a ‘pollen budget’ can predict critical resources for a given size of specialised bee population, and thereby provide a tool in conservation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.