Abstract
Purpose: The critical pathway (CP) is to standardize the clinical practice of specialists working to optimize care. The objective of this study was to develop a critical pathway for the surgical treatment of patients with colorectal or gastric cancer and to evaluate the results of the CP. Methods: Twenty-one patients with colorectal cancer, who were managed according to the CP between August 2005 and November 2005, were compared with 18 patients for whom this pathway had not been used between June 2004 and September 2004. Forty-eight patients with gastic cancer, who were managed according to the CP between June 2005 and September 2005, were compared with 49 patients for whom this pathway had not been used daring the same period in 2004. The length of stay and the cost per patients were compared between the CP group and the non-CP group. Results: For patients with colorectal cancer, the postoperative hospital length of stay in the CP group was significantly shorter (9.0 vs. 12.3 days, P<0.001), but for patients with gastric caner, there was no difference (10.6 vs. 11.4, P=0.134). The mean hospital charges were ₩5,037,816 and ₩5,263,508 for colorectal cancer and for gastric cancer, respectively, and ₩4,808,602 and ₩4,674,329, for the CP and the non-CP groups, respectively, but these differences were not significant. Conclusions: The critical pathway in colorectal and stomach surgery decreased the length of stay and might regulate hospital charges. Such a pathway could be easily designed and implemented at hospitals and could standardize clinical practice.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.