Abstract
Island systems present a singular opportunity for understanding processes of human development and for exploring the conditions that can make such processes sustainable. In this chapter, I attempt to summarize many of the points made throughout this book to provide a methodology for achieving sustainable development in island systems, such as the Galapagos. The methodology proposed relies on the construction of a comprehensive input-output matrix for an island, coupled to a detailed, spatiotemporally explicit model of resource use and human occupation. This matrix maps inputs to outputs such as economic activity, migration, and pollution, via internal causal processes in human settlements. At each step – inputs, outputs, and internal processes – the variables involved are observable and measurable, supporting a process of continuous improvement in data collection and modeling. Such a systems-level model can then be used to explore ways to eliminate adverse outputs while supporting human and natural development and biodiversity, in an empirically transparent and testable way. I discuss some of the challenges and trade-offs in the construction of these models as the basis for a general strategy for achieving sustainability in island systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.