Abstract

PurposeThis paper aims to examine the use of the increasingly important virtual concept to deliver value in projects, focusing on the manifest, critical issues which can enhance value delivery in virtual construction projects.Design/methodology/approachThe study uses both quantitative and qualitative triangulated methods to examine the concepts in the study. Triangulated data analysis is also used to give insight.FindingsThe study disentangles 16 manifest, independent variables as being crucial in enhancing value delivery in virtual construction projects. Also the research gives a fresh view, by differentiating between influential and necessary crucial variables in virtual construction project value delivery.Research limitations/implicationsThe study demonstrates the use of triangulation in critical variables research. It also gives integrated insight on rigorous, triangulated, data analysis to enhance understanding in the critical variables research domain.Practical implicationsThe research gives insight to managers on the issues which need attention in the design and implementation of virtual construction projects to deliver value.Originality/valueThe research adds value to the literature on the virtual construction project delivery concept, where little knowledge exists. Based on empirical evidence, the study also gives a fresh insightful lens, for the examination of critical variables from the perspective of influential and necessary items.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.