Abstract
The input–output inoperability model (IIM) is a simple, but powerful, mechanism for analyzing the cascading effects induced by critical infrastructure dependencies and interdependencies. IIM typically uses financial data as a measure of the dependency phenomena. Since financial data is only one of the many dimensions for analyzing dependency phenomena, the quality of IIM parameters and, thus, the reliability of IIM results can be affected negatively. This paper proposes a methodology for evaluating IIM parameters based on technical and operational data. The data is collected by interviewing experts and is processed using a fuzzy set based methodology. A case study involving Italian critical infrastructure sectors is used to demonstrate the effectiveness of the methodology.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Critical Infrastructure Protection
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.