Abstract

Industrialized Building System (IBS) is one of the approaches that had been introduced as an alternative to conventional building method where it becomes the new strategy of enhancing the sustainable construction in current industries while spearheading a huge advancement of benefits with green constructions into the existing industries. The IBS approach is actively promoted through several strategies and incentives as an alternative to conventional building methods. Extensive uptakes of modern Information Communication Technology (ICT) applications are able to support the different IBS processes for effective production. However, it is argued that ICT uptake at the organisational level is still in its infancy. This raises the importance to identify critical inhibitors which are inhibing the effective uptake of ICT in the IBS production management process. Critical inhibitors to ICT uptake were identified through questionnaire survey with the IBS industry stakeholders. The mean index and critical t-values are generated with the use of the quantitative tool, Statistical Package for Social Sciences (SPSS). The top ten priority ranked inhibitors reflect the Cost, People and Process elements to ICT uptake. High costs in acquiring the technologies and resistance to change were some main concerns from the findings.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.