Abstract

To address problems associated with mining above gob piles in the Chinese midwest mining area, a mechanic model for a coal pillar was established based on the displacement variation method. Additionally, the effect of critical unfilled zone height in the underlying gob (UZHUG) on the coal pillar was investigated through a 3DEC numerical simulation; fieldwork was conducted with a borehole televiewer to measure the UZHUG in the Yuanbaowan Coal Mine. The results indicated that the shear stress value and distribution layout in the coal pillar were affected by the UZHUG. The larger the UZHUG, the greater the shear stress and the wider the distribution scope, moving from two sides to the middle zone. Moreover, the larger the UZHUG, the smaller the maximum bearing capacity of the coal pillar, and subsequently, the greater the horizontal deformation of the coal pillar and roof convergence. The critical UZHUG is 2 m considering coal pillar deformation and stress transfer characteristics. Field measurements have confirmed that the UZHUG of 2 m ensured safe mining in the No. 6 coal seam. However, a second round of filling is needed when achieving a UZHUG of 4.4 m. This study serves as a reference for safe mining above gob piles.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.