Abstract
This paper presents a study conducted to identify, assess, rank, and compare the most influencing factors causing schedule delays during the construction phase of petrochemical projects in Saudi Arabia. The methodology followed in this research to achieve the main aims is a combination of the comprehensive review of the literature and the interviewing of a number of local experts, which have resulted in identifying 23 factors. A total of 90 completed responses were gathered from 106 received responses. The study found that the most influencing factors causing schedule delays during the construction of petrochemical projects in Saudi Arabia are “Poor site management and supervision by contractors”; “Conflict between the main contractor and subcontractor”; “Poor planning and scheduling of projects by the contractor”; “Delays in material or equipment delivery”; and followed by “Delays in Handing Over Construction Site to the Contractor”. This paper is original in the sense that the areas of knowledge and practice covered in the identified factors were distributed and not available in one source. The factors are derived from personal interviews with selected project managers, project engineers, construction supervisors, and the others from different positions in the project department and from the relevant literature.
Highlights
Petrochemicals industries are very crucial in our daily life today
These type of construction projects are impacted mostly during the construction phase, which may lead to cost overrun and/or time delay, which results in millions of dollars of losses
Petrochemicals became an essential material for many varieties of downstream products such as rubbers, plastics, polyvinyl chloride (PVC), clothes, kids’ toy, and fertilizers, and so forth
Summary
Petrochemicals industries are very crucial in our daily life today. It requires the investment of a huge capital annually on different construction projects. These type of construction projects are impacted mostly during the construction phase, which may lead to cost overrun and/or time delay, which results in millions of dollars of losses. Petrochemicals became an essential material for many varieties of downstream products such as rubbers, plastics, polyvinyl chloride (PVC), clothes, kids’ toy, and fertilizers, and so forth. The huge demand for petrochemicals material in the whole world led to the expansion of existing plants and the construction of new ones.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have