Abstract
We propose a framework for describing the Critical Chain Project Management (CCPM) method based on a Max-Plus Linear (MPL) representation for multiple projects. The framework takes into account time buffers in both a single and multi-project environments which play a role for controlling undesirable state change and protecting the completion time for the entire system. The appropriate position and size of these buffers are determined for a large scale multi-project system. Furthermore, the MPL system with the CCPM method applied is redefined to easily comprehend the structure of the system. Finally, we confirm the proposed framework through a numerical example.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Advanced Mechanical Design, Systems, and Manufacturing
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.