Abstract

Environmental friendly field development is a key target for Sakhalin Energy in this tough operating environment. During three years of cuttings injection in a Cuttings Re-injection (CRI) well, injection rate decreased twice, leading to two screen outs and consequent perforation of back-up zones. However domain capacity modeling indicated that injection of a bigger slurry volume should be possible contrary to reality. Using historical data records (injection pressure, volume and rate), and step rate injectivity test, an analysis was performed to understand what injection rate is a key parameter to optimize domain capacity. However the existing injection pumps (1 primary, and 1 backup) were limited to an optimal rate of 2 bpm each. Putting the two injection pumps in parallel made it possible to achieve the optimal injection rate of about 4 bpm, thereby lowering injection pressure, and making injection performance mimic domain model expectation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.