Abstract

The article considers the feasibility, capabilities, and sequence in the creation of an automatic engineer’s workstation for control devices for Ural series gas-pumping plants with the use of the HARTprototype. A preliminary list of operations that may be implemented with the use of the engineer’s automated control device workstation is presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call