Abstract
The article considers the feasibility, capabilities, and sequence in the creation of an automatic engineer’s workstation for control devices for Ural series gas-pumping plants with the use of the HARTprototype. A preliminary list of operations that may be implemented with the use of the engineer’s automated control device workstation is presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have