Abstract

The paper introduces and develops a method for investigating the application of mathematical programming to the concept of crashing in Program Evaluation and Review Technique (PERT). The main objective is the minimization of the pessimistic time estimate in PERT networks by investing additional amounts of money in the activities on the critical path. The constructed mathematical model, which is built in terms of additional amounts of money that must be invested, shows that minimizing the pessimistic time decreases project duration and, at the same time, reduces its variance. The result of applying the model showed that the probability of realizing the terminal node is increased.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.