Abstract

In this paper, we examine crane scheduling for ports. This important component of port operations management is studied when the non-crossing spatial constraint, which is common to crane operations, is considered. We assume that ships can be divided into holds and that cranes can move from hold to hold but jobs are not pre-emptive, so that only one crane can work on one hold or job to complete it. Our objective is to minimize the latest completion time for all jobs. We formulate this problem as an integer programming problem. We provide the proof that this problem is NP-complete and design a branch-and-bound algorithm to obtain optimal solutions. A simulated annealing meta-heuristic with effective neighbourhood search is designed to find good solutions in larger size instances. The elaborate experimental results show that the branch-and-bound algorithm runs much faster than CPLEX and the simulated annealing approach can obtain near optimal solutions for instances of various sizes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.