Abstract

Traditional methods of timber frame construction are labour-intensive and time-consuming. This paper details a study of the crane-erect method of construction which utilises on-site preparatory work and off-site fabrication. The paper also examines the project planning alterations and implications which are required for crane-erect construction to be successful and the feasibility of crane erect with regard to improved time, cost and safety.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.