Abstract

This paper presents the results of a study on the early-age cracking behavior of diaphragm in long-span prestressed concrete box girder bridge with cracking control techniques. Based on the three-dimensional hydration heat temperature conduction and humidity diffusion theory, and according to the similarity of differential equation between the humidity diffusion theory and temperature conduction theory, the early-age cracking of diaphragm was simulated by a three-dimensional finite element model with consideration of concrete shrinkage, creep, cement hydration heat and variation of temperature. The numerical simulation accurately predicts the cracking region and size and stress time history of diaphragm, and provides load standard for cracking control techniques of prestressing force. The cracking control techniques of prestressing force effectively avoid the early-age cracking of diaphragm by application of practical engineering.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.