Abstract

As the complex structure, large size, hot climate, aggressive corrosive environment and high concrete strength grade for Super-large Section Precast Immersed Tube of Hong Kong-Zhuhai-Macao Bridge, crack control of concrete was difficult. On the basis of simulating analysis on thermal stress, temperature control design was carried out. Harmful crack could be effective controlled by series of treatment measures during construction period such as optimization of raw materials, preparation of low heat and shrinkage concrete, controlling concrete raw material temperature, mixing concrete with ice shavings and cooling water, setting up automatic maintenance system and automatic temperature monitoring system. From the monitoring results, the temperature monitoring results were consistent with the simulation data, and the maximum temperature and the temperature difference between concrete surface and internal concrete were met the requirement of temperature control standard. Moreover, the precast immersed tube didn’t appear harmful crack.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.