Abstract

A detailed analysis of the available literature and the aerospace manufacturing industry has identified a lack of cost estimation techniques to forecast advanced manufacturing technology development effort and hardware cost. To respond, this article presents two parametric ‘Constructive Technology Development Cost Models’ (COTECHMO). The COTECHMO Resources model is the first and is capable of forecasting aerospace advanced manufacturing technology development effort in person-hours. When statistically analyzed, this model had an outstanding R-squared value of 98% and a high F-value of 106.65, validating model significance. The general model accuracy was tested with 53% of the forecast data falling within 20% of the actual. The second, the COTECHMO Direct Cost model is capable of forecasting the development cost of the aerospace advanced manufacturing technology process hardware. This model had an inferior R-squared value of 76% and an F-value of 5.59, although each was still valid to determine model signi...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call