Abstract

Concrete bridge approach slabs (BASs) are used at the interface between bridge abutments and pavements that rest on compacted embankment. The objective of the research presented here was to develop optimal-cost BAS designs for new and replacement slabs. Two solutions presented here included (a) cast-in-place (CIP) design for new construction and (b) novel, precast, prestressed (PCPS) slab designs for new construction and replacement of BASs. The practices of state departments of transportation (DOTs) with respect to BASs were evaluated and compared with those of the Missouri DOT. On the basis of the practices, a 20-ft span was chosen and finite element models were analyzed to consider different slab lengths, thicknesses, and loss of support conditions to calculate maximum moments, deflections, and end slopes. On the basis of predicted values, CIP and PCPS design alternatives were recommended. Recommended alternatives were estimated to have a lower cost and a performance equal to or better than the current Missouri DOT designs. A new study has been initiated in which the recommended BAS designs are to be implemented in the field.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.