Abstract

As the complexity of design and fabrication for instrumentation-on-silicon systems increases, the optimization of a combined Built-In Self-Test (BIST) and Automated Test Equipment (ATE) process is desirable to meet the high fault coverage while preserving acceptable costs. For digital systems, the costs associated with a combined BIST/ATE testing process mainly consist of the following components: 1) the cost due to the BIST area overhead and 2) the cost due to the overall test time. In general, BIST is faster than ATE, but it can provide only a limited fault coverage; for attaining a higher fault coverage from BIST, additional area (at a corresponding higher cost) is required. However, a higher fault coverage can usually be achieved from ATE, but excessive use of ATE results in additional test time (as an increased cost). The fault coverage of BIST and ATE plays a significant role, because it can affect the area overhead in BIST and the test time in BIST/ATE. This paper proposes a novel numerical method to find the optimized fault coverage by BIST and ATE so that minimal cost can be achieved. The proposed method is then applied to two parallel combined BIST/ATE testing schemes to ensure its validity

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.